Weather

Vitebsk
Brest
Hrodna
Homiel
Mahilyow
Мinsk

Statistics

Articles View Hits
26964892

Recommend Print

Vitebsk BCD activists gathered 945 signatures for the construction of a waste plant

Vitebsk activists organizing committee of the party "Belarusian Christian Democracy" Tatiana Seviarynets and Elena Shabunya (pictured) was transferred to the State Control Committee 48 945 signatures on the signature sheets for the construction of a waste recycling plant. Signatures were collected during a local campaign: how while collecting signatures and campaign. He took them to the SCC Vitaly Stepanov, who all talk with activists recorded on tape.

BCD representatives tried to tell about the collected signatures and newspaper Vitebsk City Council "Vitbichi" which wrote a year ago that the waste treatment plant will be built in two years, but construction is almost never started. However, the newspaper refused to write about it. Like that construction waste recycling plant in Vitebsk, which was to be opened in 2011, not even in the plans for 2014.

"The authorities need to think again on the construction of the plant. Hopes, however, it is small, because the construction is very expensive, as previously identified by this means disappeared no one knows where," - said the coordinator of the organizing committee of the BCD Tatiana Seviarynets.

bchd.info